How much does a kitchen remodel cost?
Kitchen remodels start at $27,500 for a same-layout kitchen (70–100 sq ft), $32,500 when the layout changes, and $42,500 when walls are opened and everything is custom. Larger kitchens cost more, and your final number comes from your 3D drawings and your finishes. Appliances are not included. The Pricing page lists every level and size.
How much does a bathroom remodel cost?
Bathroom remodels start at $14,999 for a 3-fixture hall bathroom with the same layout, $22,500 when we take it down to the studs, and $27,500 for a new layout with premium finishes. Larger bathrooms and primary suites cost more. The Pricing page shows each size.
How much does it cost to finish a basement?
Basement finishing starts at $47,500 for 500–700 sq ft with a bathroom, and goes up with size and with extras like a media wall, wet bar, theater or bedroom suite. The Pricing page lists the Bronze, Silver and Gold levels for every size.
What is included in your starting prices?
Starting prices include labor, rough materials and a finish allowance for the tile, fixtures and finishes you pick with us. They do not include permits and architect fees, appliances, structural changes, code corrections to existing systems, mold or asbestos remediation, or moving plumbing or electrical beyond what the level lists. Anything we find behind the walls is priced separately and never started without your OK.
Do you charge for estimates or design?
The first visit and estimate are free. The 3D design, a full Chief Architect design with renderings, floor plan and elevations, is free when you build with us.
Do you offer financing?
Yes, through Acorn Finance, a lending marketplace where you can compare offers from several lenders. Loans go up to $100,000 with terms up to 20 years. Pre-qualifying takes about a minute and uses a soft credit check. Your rate and term are set by the lender.
How long does a remodel take?
On site, a bathroom takes about 3–5 weeks, a kitchen about 6–10 weeks, and a basement about 8–12 weeks, depending on size and scope. Cabinets, stone, tile and glass are ordered ahead, so ordering time comes before the start date.
Can I stay in my house during the remodel?
Yes. Most families do. We protect your floors and stairs, contain dust and clean up every day. For a kitchen, most people set up a small temporary kitchen in another room. If you have only one bathroom, tell us at the first visit and we will plan around it.
How does a project work from start to finish?
It runs in eight steps: a discovery call, a design consultation at your home, measuring and a first concept, a 3D design review, material selections, a pre-construction walk, construction, and a final walkthrough with your warranty. You get one point of contact from the first call to the last.
Who works on my project?
The same crew is on site from demolition through the final walkthrough. Plumbing and electrical are done by licensed plumbers and electricians, and everything is handled under one contract.
What is the 3D design?
Before anything is built, we draw your room in Chief Architect: 3D renderings, a floor plan and elevations. You see the layout, finishes and lighting and can change anything on paper, where changes are free.
Do I need a permit?
Many remodels do, especially when plumbing, electrical or structure changes. We handle the permit paperwork and schedule the inspections where they are required. Permit fees are not included in starting prices.
Are you licensed and insured?
Yes. HSC HomeServe Construction is licensed and insured, plumbing and electrical are done by licensed plumbers and electricians on every job, and a certificate of insurance is available on request.
What warranty do you offer?
Every project is backed by a 5-year workmanship warranty.
Can you move the sink or the range?
Often yes. Moving plumbing, gas or venting changes the scope, so we plan it in the design stage and price it clearly in your written proposal.
How long will I be without a kitchen?
The kitchen is out of use during demolition and most of construction, and your schedule shows the exact weeks. Ordering time for cabinets and counters happens before demolition, so it does not add to the time without a kitchen.
Do I need to hire the countertop and tile people myself?
No. We coordinate every trade under one contract, so you deal with one team.
How much of a kitchen budget goes to cabinets?
Cabinets are usually the biggest single line in a kitchen, often around a third of the total. The grade you pick (stock, semi-custom or custom) moves the number the most. We show the options side by side in your proposal.
What is the difference between stock, semi-custom and custom cabinets?
Stock cabinets come in set sizes and finishes, semi-custom let you change sizes and details, and custom cabinets are built to your room. Stock is the lowest price and custom the highest. Semi-custom is a common middle choice, and lead times are longer as you move up.
Can you reface my cabinets instead of replacing them?
Refacing can make sense when your layout stays the same and the cabinet boxes are in good shape. If the layout changes or the boxes are damaged, new cabinets are usually the better value. We look at yours at the free estimate and tell you honestly.
Quartz or granite for kitchen counters?
Quartz is engineered, non-porous and does not need sealing. Granite is natural, handles heat well and may need sealing from time to time. Both are durable, so it usually comes down to look and budget. We can bring samples to your home.
When are countertops measured and installed?
Stone counters are measured after the cabinets are installed, then fabricated and installed. That step takes time, so we build it into your schedule. Your sink and cooktop choices need to be final before the measurement.
How much space should I leave around a kitchen island?
About 42 inches of clear walkway on each working side is a common target, and about 48 inches if two people cook at once. We test this in your 3D design before anything is ordered.
Island or peninsula: which is better?
An island needs room to walk all the way around it. A peninsula attaches to a wall or cabinet run and fits smaller or narrower kitchens. Your room size and layout decide, and your 3D design shows both.
Can we open the wall between the kitchen and dining room?
Often yes. First we find out whether the wall is load-bearing. If it is, it needs a properly sized beam and usually a permit, which changes the scope and price. This is the kind of job in our $42,500 starting tier, where walls are opened.
Where should the range hood vent?
When the layout allows, the hood should vent to the outside rather than recirculate air back into the kitchen. The duct route is part of the design stage, because it affects cabinets, walls and ceilings.
Can I switch from a gas range to electric or induction?
Yes. An electric or induction range needs its own 240-volt circuit, and the gas line is capped safely if it is no longer used. We plan this at the design stage and put it in your written proposal.
Can I keep my existing appliances?
Yes, if they fit the new layout. Tell us at the first visit so we design around their exact sizes. Appliances are not included in our starting prices, whether you keep yours or buy new ones.
When should I order appliances?
Early. Cabinets and counters are built around the exact size of your appliances, so we want the model numbers before ordering the cabinets. We will tell you when in the schedule to buy.
Do you update the electrical in the kitchen?
New electrical work is done to current code and inspected where required. Fixing existing wiring that is not part of the work is priced separately, and we tell you before anything is started.
How do I choose a kitchen layout?
The common layouts are L-shaped, U-shaped, galley and island kitchens. The room, the windows and doors, and how you cook decide which works best. We draw your options in 3D so you can compare before committing.
What kitchen lighting should I plan for?
Most kitchens work best with three layers: general lighting from the ceiling, task lighting under the cabinets, and accent or pendant lights over an island. Planning the wiring early is much cheaper than adding it later.
What storage upgrades are worth it?
Pull-out trays, deep drawers for pots, a trash pull-out, a tall pantry and soft-close hardware are the upgrades people use every day. We show where they fit when we draw your cabinets.
How tall should the backsplash be?
The standard is the counter to the bottom of the upper cabinets. Running tile to the ceiling behind a range or hood is a popular look. We price each option when we go over selections.
What if you find a problem behind the walls?
It happens in older homes: old wiring, plumbing or water damage. We stop, show you, and price the fix separately. Nothing extra is started without your OK.
What if I want to change something after construction starts?
Changes are free on paper during the 3D design stage. After construction starts, a change is written up with its price before the work is done, so you always know the cost first.
How do I get an exact price for my kitchen?
Start with the free estimate at your home. Then we draw your 3D design, pick materials together and put everything in a written proposal. Starting prices on the Pricing page are a guide, and the final number comes from your design and finishes.
Can you turn a tub into a walk-in shower?
Yes. It is one of our most popular projects, and we show it in 3D before you commit.
What is a curbless shower?
A shower with no step up, so the floor flows from the bathroom into the shower. It looks clean and is easier to use at any age.
How do you waterproof a shower?
We install cement board and a waterproof membrane system, such as Schluter, over every surface that gets wet. Corners, niches and the drain are sealed, and the shower pan is flood-tested before any tile is set.
How long will my bathroom be out of use?
Plan on about 3–5 weeks on site for a typical bathroom, plus ordering time for tile, vanity and glass before we start. If it is your only bathroom, tell us at the first visit and we will plan around it.
Walk-in shower or keep the tub?
A walk-in shower is easier to use and looks more open. If it is your only tub in the house, or you have young kids, keeping a tub can matter for resale and daily life. We can draw both in 3D.
What is a shower niche?
A built-in shelf recessed into the shower wall so bottles do not sit on the floor or hang from a rack. It needs to be framed and waterproofed carefully because it has many corners. We choose the size and position with you in the design.
Frameless or framed shower glass?
Frameless glass has no metal around the panels and looks cleaner. Framed glass costs less and is more forgiving of small wall differences. Custom glass is measured after the tile is done, so we plan that step in the schedule.
Is large-format tile a good choice?
Large tiles mean fewer grout lines, so the surface looks cleaner and is easier to wipe down. They need a flat surface, and the layout has to be planned so you avoid thin cuts at walls. We plan the layout before tile is set.
Can you add heated floors?
Yes. An electric heating mat goes under the tile and needs its own circuit and a thermostat. It is easiest to add during a remodel while the floor is open.
Do I need a new exhaust fan?
Almost always a good idea. Bathrooms need a fan that vents outside, not into the attic, to control humidity and prevent mold. We size it for the room and put it in your proposal.
Can you add a second sink or a double vanity?
If the room is wide enough, yes. A double vanity also needs both drains and supply lines. We check the space in 3D first, and you will see whether a double fits comfortably.
What vanity height is best?
Standard vanities are lower, and comfort-height vanities are closer to kitchen counter height. Tall adults often prefer the taller one. We help you choose with your height and your family in mind.
Should I plan for grab bars?
If you want the option now or later, yes. Solid blocking inside the wall lets bars be installed anywhere, and it is much easier to add while the walls are open. It costs little at the framing stage.
What floor tile is slip-resistant?
Look for tile with a textured finish, and smaller tiles with more grout lines grip better on a wet shower floor. We will help you balance safety and look when we go through selections.
What is the difference between cement and epoxy grout?
Cement grout is the standard choice and should be sealed. Epoxy grout resists stains and moisture better and costs more to install. For a shower we will go over which suits your budget and use.
Will you replace the shower valve and pipes?
When the wall is open, replacing an old valve is a smart move because it is cheap now and expensive later. We look at your pipes during demolition and recommend what to change.
What toilet should I choose?
Comfort-height toilets sit higher and are easier to use. Elongated bowls are more comfortable than round. We check clearances in the design so the toilet fits the space properly.
Can you make my bathroom bigger?
Sometimes, by borrowing space from a closet or neighboring room. Moving walls affects plumbing, electrical and sometimes structure, so we look at it during the design stage. That is the work in our $27,500 new-layout level.
Do you do the plumbing and electrical?
Yes, with licensed plumbers and electricians on every job, all under one contract with us. You do not have to hire them separately.
What lighting should a bathroom have?
Light at the mirror from both sides, or a lit mirror, avoids shadows on your face. A light inside the shower is common for walk-in showers. Everything near water has to be rated for it. We plan this with your design.
What happens to my old tub, vanity and tile?
They are removed during demolition and taken out of your home. Your project schedule shows the day demolition starts.
What does it cost to move the toilet, tub or shower?
Moving fixtures changes the plumbing and sometimes the floor framing, so the price goes up. Keeping fixtures where they are is the lowest-cost option. We show both choices in your written proposal.
What is a primary suite remodel?
It is a larger bathroom, often with a double vanity, a bigger shower, a soaking tub and sometimes a closet or dressing area. Pricing starts with larger sizes on our Pricing page, and the design decides the final number.
Can a basement with water problems be finished?
Often yes, but the water has to be dealt with first. We look at where moisture is coming from and fix it before anything is built over it.
Do basement remodels need permits and inspections?
Most do. We handle the paperwork, and the rough work is inspected before the walls are closed where required.
Can you add a bathroom, bar or bedroom?
Yes. That is part of the design stage, and we show you where each one fits in 3D before you commit. A basement bedroom needs a proper egress window, which is easiest to plan from day one.
How high does my basement ceiling need to be?
Building codes set a minimum finished ceiling height, commonly around 7 feet, and your village's rule decides. We measure at the free estimate and tell you if ducts or beams are an issue.
Should I test for radon before finishing the basement?
Yes. Radon is common in northern Illinois homes, and the test is inexpensive. If the level is high, a mitigation system is much easier to install before the walls are finished.
How do you keep a finished basement from feeling damp?
We find where moisture comes in and fix that first. After that, the walls and floor are built with materials that handle moisture, such as moisture-resistant subfloor products. Nothing should be built over an active water problem.
What flooring works best in a basement?
Luxury vinyl plank and tile handle moisture well and are the most common choices. Solid hardwood glued directly to concrete is not a good idea. We pick the right floor system with you based on the conditions.
Where does the sump pump go, and can I still reach it?
The pump stays accessible. We build around it so it can be serviced and checked. We also plan access to the main shutoff and cleanouts.
Will I be able to get to the furnace and water heater?
Yes. Mechanical equipment is kept accessible with access panels or doors, and enough clearance is left around it. It also has to meet code, so we plan it into the design.
Drywall ceiling or drop ceiling?
A drywall ceiling looks cleaner and more finished. A drop ceiling makes access to pipes, valves and wiring easier. Some basements use a drywall ceiling with access panels in the right spots. We show both in your design.
How do you handle ducts and low beams?
Soffits and boxed-in sections hide them, and the layout is planned so they land in places you will not notice, such as along walls or over a closet. We measure and draw this before building.
How do you insulate and warm a basement?
The walls are insulated to keep the room from feeling cold, and heating and cooling supply is extended into the new space. Your design shows where vents and returns go.
Can I put a bathroom in my basement?
Yes. If the drain is below the main sewer line, an ejector pump lifts waste up. Otherwise we cut the concrete and run new drain lines to the existing line. Our $47,500 starting price for 500–700 sq ft includes a bathroom.
Can you add a wet bar to a basement?
Yes. A bar with a sink needs water supply and a drain, so it is planned with the plumbing. Without a sink, it is simpler and costs less. A wet bar is one of the extras listed on the Pricing page.
How do you plan a basement home theater?
We plan seating, screen position and wiring early. Insulation in the ceiling and walls helps with sound, and dark finishes help the picture. Your design shows where speakers, outlets and the screen go.
What is a media wall?
A feature wall that holds the TV, often with built-in lighting, an electric fireplace or shelving. It is planned with the electrical so the cords are hidden.
Is the electrical panel big enough for a finished basement?
Often yes, but not always. A finished basement adds lights, outlets and sometimes a bar, bathroom or theater. A licensed electrician checks your panel and tells us if it needs work.
What smoke and carbon monoxide detectors are required?
Code requires working smoke alarms and carbon monoxide alarms, and a finished basement usually needs them added. We include them in the electrical plan and the inspector checks them.
What are the stair rules for a finished basement?
Stairs and railings have to meet code for rise, run, handrails and headroom. We check yours at the free estimate and tell you if anything needs to change.
Can I finish only part of my basement?
Yes. Many homeowners finish a family room and bathroom and leave a storage or laundry area unfinished. We plan the finished space and keep mechanicals accessible.
Does a finished basement add value?
It adds usable living space, and many buyers like it. The return depends on your market and the quality of the work. We cannot promise a number, and it is worth asking a local real estate agent.
Do I need an egress window in a finished basement?
Any basement bedroom needs an egress window or door, and many areas require one for a finished basement with living space. We check the code with your village and plan the window opening in the design.
Where should I start if I want to finish my basement?
Call or text (773) 220-5180 and tell us the size and what you want, such as a bathroom, bar or bedroom. We visit your home for a free estimate, then draw your 3D design.
Where do you work?
We are based in Hanover Park and serve Schaumburg, Hoffman Estates, Bartlett, Streamwood, Roselle, Bloomingdale, Elgin, St. Charles and nearby suburbs across Cook, DuPage, Kane, Lake and McHenry Counties. Not sure about your town? Call or text (773) 220-5180.
How do I get started?
Call or text (773) 220-5180, or send the estimate form. Tell us the room and roughly what you want to spend; photos help. We will set up a time to talk it through at your home.